DUK-SE53 VRV IV i Series Installation

DUK-SE53 VRV IV i Series Installation
Featured

DUK-SE53 VRV IV i Series Installation

Previous attendance to Daikin DUK-SE33 is required or up to date knowledge of VRV Air cooled equipment

Objectives Who is it for?
  • Product introduction
  • Install and commissioning requirements
Install and commissioning engineers with refrigeration and safe handling knowledge
Duration Trainer
1 day. Lunch included. Daikin UK technical engineer
Programme
  • Product introduction
  • System selection
  • Installation of field piping
  • Installation of field Wiring
  • Installation of condensate drainage
  • System control
  • Commissioning requirements
  • Optional accessories
  • System change over options
  • Use of the remote controller
  • Service codes and settings
  • Questions and answers