DUK SE23 Altherma Monobloc Installation

DUK SE23 Altherma Monobloc Installation
Featured

DUK SE23 Altherma Monobloc Installation

Objectives Who is it for?
  • Product introduction
  • Installation requirements
  • Commissioning procedures
Installation and commissioning engineers
Duration Trainer
1 day. Lunch included. Daikin UK technical engineer or regional college lecturer
Programme
  • Product introduction
  • Options and technical specifications
  • Daikin Altherma selection software
  • Air-water heat pump
  • Mechanical installation
  • Electrical installation
  • System flow rates and volumes
  • Use of remote controller interface
  • Advanced functional overview
  • Recommended maintenance
  • Basic fault finding
  • Questions and answers