DUK-SE11 Daikin Altherma LT Installation (now also including the new LT integrated products)

DUK-SE11 Daikin Altherma LT Installation (now also including the new LT integrated products)

DUK-SE11 Daikin Altherma LT Installation (now also including the new LT integrated products)

Objectives Who is it for?
  • Product introduction
  • Installation requirements
  • Commissioning procedures
Installation and commissioning engineers
Duration Trainer
2 days. Lunch included at all Daikin UK training centres. Daikin UK technical engineer, or regional college lecturer
Day 1 Day 2
  • Product introduction
  • R22 legislation
  • Options and technical specifications
  • Daikin Altherma selection software
  • Air-water heat pump
  • Mechanical installation
  • Electrical installation
  • System water and refrigerant flows
  • Pre-start up checks and field settings
  • Use of the remote control interface
  • Advanced functional overview
  • Recommended service and maintenance
  • Fault finding
  • Questions and answers